Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Bubshait, A A and Cunningham, M J (1998) Comparison of Delay Analysis Methodologies. Journal of Construction Engineering and Management, 124(04), 315–22.

Chao, L and Skibniewski, M J (1998) Fuzzy Logic for Evaluating Alternative Construction Technology. Journal of Construction Engineering and Management, 124(04), 297–304.

Faniran, O O, Oluwoye, J O and Lenard, D J (1998) Interactions between Construction Planning and Influence Factors. Journal of Construction Engineering and Management, 124(04), 245–56.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(245)
  • Abstract:
    This paper provides a framework for the development of strategies for improving construction planning practices. Interrelationships between construction planning and situational factors in the environments within which construction planning is undertaken were examined using regression analysis. Factors having a critical influence on construction planning were identified. The results revealed three critical factors that should be incorporated into strategies for improving construction planning effectiveness: (1) Investment of substantial quality time for construction planning prior to the commencement of work on-site; (2) reduced emphasis on developing schedules for monitoring and controlling project progress; and (3) increased emphasis on developing operational plans for project implementation. Significant relationships between the project's environment, organizational characteristics of construction firms, planners' efforts, and construction planning effectiveness are discussed. The paper concludes with implications for construction planning practice.

Garza, J M d l, Hancher, D E and Decker, L (1998) Analysis of Safety Indicators in Construction. Journal of Construction Engineering and Management, 124(04), 312–4.

Harmelink, D J and Rowings, J E (1998) Linear Scheduling Model: Development of Controlling Activity Path. Journal of Construction Engineering and Management, 124(04), 263–8.

Harris, R B and Ioannou, P G (1998) Scheduling Projects with Repeating Activities. Journal of Construction Engineering and Management, 124(04), 269–78.

LeBlond, D, Owen, F, Gibson, G E, Haas, C T and Traver, A E (1998) Control Improvement for Advanced Construction Equipment. Journal of Construction Engineering and Management, 124(04), 289–96.

Moon, S and Bernold, L E (1998) Graphic-Based Human-Machine Interface for Construction Manipulator Control. Journal of Construction Engineering and Management, 124(04), 305–11.

Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS Approach for Automating Preconstruction Activities. Journal of Construction Engineering and Management, 124(04), 257–62.

Tommelein, I D (1998) Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique. Journal of Construction Engineering and Management, 124(04), 279–88.

Toole, T M (1998) Uncertainty and Home Builders' Adoption of Technological Innovations. Journal of Construction Engineering and Management, 124(04), 323–32.

Wang, S Q, Tiong, R L K, Ting, S K, Chew, D and Ashley, D (1998) Evaluation and Competitive Tendering of BOT Power Plant Project in China. Journal of Construction Engineering and Management, 124(04), 333–41.